Work backwards from handover
Completion is recorded as 2025–2028. Put your financing, current tenancy and intended move-in date on the same timeline.
BANGSAR / PROJECT GUIDE
A multi-phase leasehold development in Bangsar South with practical family sizes and two parking bays across the published layouts.
THE SHORTLIST TEST
Bangsar Hill Park may suit households that want a newer high-rise home near Bangsar South and prefer two parking bays from the outset.
Phase 1 and Phase 2 complete at different times. Confirm the block, handover timing, parking arrangement and view before comparing quotations.
Compare other homes in BangsarNEW LAUNCH LENS
For a home that is not yet completed, the timeline and selected plan should be tested together.
Completion is recorded as 2025–2028. Put your financing, current tenancy and intended move-in date on the same timeline.
3 published layout groups are shown here. Compare room dimensions, circulation and parking before choosing a package.
SPA prices from: Ask for current range. Ask for the exact home, floor, facing, parking and package in one quotation.
LAYOUTS THAT SOLVE DIFFERENT NEEDS
Put phase, block and parking beside every layout comparison. The same development name covers different handover dates and daily arrival patterns.
Compact family plans
Check room widths and whether the plan gives enough storage for daily family use.
Ask about this layoutMid-size plans
Compare balcony, utility and dining positions between blocks.
Ask about this layoutLarger plans
Confirm whether parking is side-by-side or tandem for the chosen floor.
Ask about this layoutFLOOR PLANS
WHAT CHANGES THE DECISION
Developer: Sunrise Capital Holdings Berhad
5.7 acres · 1,600 homes across Phases 1 and 2
The published project information lists two bays for the homes, with arrangement varying by type or floor.
Phase 1 and Phase 2 follow different timelines, which may affect move-in planning and the surroundings at handover.
AROUND THE PROJECT
Test the route through Bangsar South at office peak time, then compare access toward Bangsar, Petaling Jaya and your regular school or workplace.
Bangsar, Kuala Lumpur
PLACE IT BESIDE THE RIGHT HOMES
One stays close to the location, one follows the published positioning, and one changes the trade-off.
Same local search
Bangsar, Kuala Lumpur
It keeps the search in Bangsar. Its 18 homes create a smaller community than Bangsar Hillpark @ Bangsar, so compare the arrival, lifts and shared spaces rather than the address alone.
Similar published positioning
Cheras, Kuala Lumpur
Its published entry reference is around RM950 psf, compared with RM1,200 psf for Bangsar Hillpark @ Bangsar. Use that only as a starting point—total price, layout and completion timing still decide the better fit.
A different trade-off
OUG & Kuchai Lama, Kuala Lumpur
This changes the decision from high-rise at Bangsar Hillpark @ Bangsar to landed. Compare privacy, upkeep and the daily journey—not only the published price.
FROM THIS PROJECT’S DETAILS
The project information places Phase 1 in 2025 and Phase 2 in 2028.
The project information lists 1,600 homes across the two phases.
The published project information lists two bays, with the exact arrangement depending on the selected home.