Work backwards from handover
Completion is recorded as Tower A Q4 2025 · Tower B Q4 2026 targets. Put your financing, current tenancy and intended move-in date on the same timeline.
KLCC / PROJECT GUIDE
Two freehold branded-residence towers within a wider mixed development, shaped around furnished homes and a design-led hospitality proposition.
THE SHORTLIST TEST
8 Conlay is for a buyer who places real value on interior design, branded service and a central Conlay address—not simply the lowest price per square foot.
Tower A and Tower B have separate completion targets and residence schedules. Confirm which tower, furnishing specification and service arrangement belong to the home you are comparing.
Compare other homes in KLCCNEW LAUNCH LENS
For a home that is not yet completed, the timeline and selected plan should be tested together.
Completion is recorded as Tower A Q4 2025 · Tower B Q4 2026 targets. Put your financing, current tenancy and intended move-in date on the same timeline.
3 published layout groups are shown here. Compare room dimensions, circulation and parking before choosing a package.
SPA prices from: Ask for current range. Ask for the exact home, floor, facing, parking and package in one quotation.
LAYOUTS THAT SOLVE DIFFERENT NEEDS
Treat the design package as part of the purchase rather than decoration. Check what is fixed, what is loose furniture and how the plan works once personal storage is added.
One-bedroom homes
A substantial city one-bedroom; inspect the living-to-bedroom balance.
Ask about this layoutFlexible homes
The broad middle range; the +1 and room proportions vary by plan.
Ask about this layoutThree-bedroom home
The family-size choice; compare usable storage and the single published parking provision.
Ask about this layoutWHAT CHANGES THE DECISION
Developer: Damai City Sdn Bhd (KSK Land)
3.95 acres · 1,062 homes
Tower A contains 564 homes and Tower B 498, so tower selection changes the arrival and completion context.
The value case includes design and hospitality elements; understand the ongoing service scope and cost before comparing with a conventional condominium.
AROUND THE PROJECT
Walk from the Conlay setting to Pavilion, the Conlay MRT and KLCC at the times you would actually travel. Decide which destination is naturally walkable for you.
KLCC, Kuala Lumpur
PLACE IT BESIDE THE RIGHT HOMES
One stays close to the location, one follows the published positioning, and one changes the trade-off.
Same local search
KLCC, Kuala Lumpur
It keeps the search in KLCC. Its 364 homes create a smaller community than 8 Conlay @ KLCC, so compare the arrival, lifts and shared spaces rather than the address alone.
Similar home profile
Bukit Bintang & KL City Centre, Kuala Lumpur
8 Conlay @ KLCC and this alternative both sit in the high-rise search, with a different timeline and 2027 completion references. Compare usable layout and total price before treating them as equivalent.
A different trade-off
Titiwangsa & Setapak, Kuala Lumpur
This changes the decision from high-rise at 8 Conlay @ KLCC to landed. Compare privacy, upkeep and the daily journey—not only the published price.
FROM THIS PROJECT’S DETAILS
The project details list 1,062 residences: 564 in Tower A and 498 in Tower B.
The project details covers one-bedroom through three-bedroom homes, including several +1 formats.
Yes. The project material identifies the development as freehold.